Report Design
 Crystal Reports Forum : Crystal Reports 9 through 2020 : Report Design
Message Icon Topic: Parameters (cascading) Post Reply Post New Topic
Author Message
shifty
Newbie
Newbie
Avatar

Joined: 12 Jul 2007
Location: United Kingdom
Online Status: Offline
Posts: 17
Quote shifty Replybullet Topic: Parameters (cascading)
    Posted: 29 Jul 2008 at 7:52am
Hi
 
I have tasks in a list and i want to find out which tasks are not completed, the only way i can do this is by finding out whether the task that is supposed to be done above the task i want to report on is complete or not. If it is and the following task is not the I know that task is pending.  N
All tasks appear in order so one knows what task should be completed in what order and I allow the user to choose this from the parameter list.  Currently this is all coming from a static list but I want to do the following.
 
I want to set up the parameters so that once someone chooses a task that is in position 5 that the end range only allows them to select tasks greater than 5 in the list.
 
I hope I am making sense.
 
shivun
 
 
IP IP Logged
Post Reply Post New Topic
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.014 seconds.