Below is a report that is giving correct TotalAmt values and they are running totals that are summarized
and put in the detail section but there is a problem. The totals are repeating several times. The totals
are pulling the right amounts only through using running total method, all other ways are not working.
If I write a formula to sum the TotalAmt, the total values go off. I used the select distinct, and getting
the same results. I tried to use previous and next formulas too, but they are not working either.
Records 9 to 11 are reapeating and so are records 19 to 20 and records 6 to 8. Any help will be appreciated
Detail: Project Buidling# structure# Date TotalAmt StrucCode
1. Det 11223 45009789 45009789 01/12/11 10011.30 05
2. 11223 45009789 45009789 01/12/11 1100.04 05
3. GH 1223 45009789 45009789 01/12/11 11111.34 05
4. 12788 78990099 78990099 01/12/11 34000.60 02
5. 12788 78990099 78990099 01/12/11 34000.60 02
6. 12788 78990099 78990099 01/12/11 566.30 02
7. 12788 78990099 78990099 01/12/11 566.30 02
8. 12788 78990099 78990099 01/12/11 566.30 02
9. 12788 78990099 78990099 01/12/11 34566.90 02
10. 12788 78990099 78990099 01/12/11 34566.90 02
11. 12788 78990099 78990099 01/12/11 34566.90 02
12. 34544 37888899 37888899 01/12/11 5566.08 06
13. 34544 37888899 37888899 01/12/11 5566.08 06
14. 34544 37888899 37888899 01/12/11 5566.08 06
15. 34544 37888899 37888899 01/12/11 5566.08 06
16. 34544 37888899 37888899 01/12/11 25560000.70 06
17. 34544 37888899 37888899 01/12/11 25560000.70 06
18. 34544 37888899 37888899 01/12/11 25560000.70 06
19. 34544 37888899 37888899 01/12/11 25565566.78 06
20. 34544 37888899 37888899 01/12/11 25565566.78 06
21. 34544 37888899 37888899 01/12/11 25565566.78 06
22. 34544 37888899 37888899 01/12/11 25565566.78 06