I am trying to plot events on a timeline. The only template available in X is the Gantt chart and that looks kind of hokey. Is there a better way to plot a time line? Perhaps there are other external graph templates to import?
secondly, I would like to replace the text labels on the graphs. in the data below, my Y axis is the ID field and I would love to replace it with the description. i.e '2' would be 'Signatures requested'. I can't seem to do that.
thanks in advance! http://www.crystalreportsbook.com/forum/smileys/smiley5.gif
Data (i have a lot of control around the data)
1 Record opened 12/1/2003
2 signatures requested 12/20/2003
3 Signature applied 12/21/2003
4 child task created 1/5/2004
5 child task closed 1/8/2004
6 Record closed 1/10/2004