Technical Questions
 Crystal Reports Forum : Crystal Reports 9 through 2022 : Technical Questions
Message Icon Topic: Problem with scheduling Post Reply Post New Topic
Author Message
priyanka.madhu
Newbie
Newbie
Avatar

Joined: 30 Dec 2007
Location: India
Online Status: Offline
Posts: 3
Quote priyanka.madhu Replybullet Topic: Problem with scheduling
     Posted: 30 Dec 2007 at 10:38pm
Hi,
 
I am facing a problem with scheduling the reports, we have schedulded a report (pdf format) that should be placed at a specified directory once it runs. My problem is that when i schedule this report to run daily it works great, but when i schedule on a weekly basis it fails. I don't understand why this is happening. Can anyone help me out with this?
 
Regards,
Priyanka
IP IP Logged
Sandy0708
Newbie
Newbie
Avatar

Joined: 27 Dec 2007
Location: India
Online Status: Offline
Posts: 4
Quote Sandy0708 Replybullet Posted: 30 Dec 2007 at 11:20pm

Hey Priyanka,

 
Can you please brief this question.
 
 
Cheers!

Sandy.

IP IP Logged
Savan
Senior Member
Senior Member
Avatar

Joined: 14 Dec 2007
Location: India
Online Status: Offline
Posts: 162
Quote Savan Replybullet Posted: 31 Dec 2007 at 3:17am

Are u scheduling through the reports through central management console? if yes then what is start time and end time  for the object that ur scheduling. check if the start time and end time for the report is shorter than the time taken for the report to be generated.

Thanks
Savan
IP IP Logged
priyanka.madhu
Newbie
Newbie
Avatar

Joined: 30 Dec 2007
Location: India
Online Status: Offline
Posts: 3
Quote priyanka.madhu Replybullet Posted: 02 Jan 2008 at 3:10am

Hey sandy,

Lemme noe what info you need

Regards,

priya

IP IP Logged
priyanka.madhu
Newbie
Newbie
Avatar

Joined: 30 Dec 2007
Location: India
Online Status: Offline
Posts: 3
Quote priyanka.madhu Replybullet Posted: 02 Jan 2008 at 3:12am

Hi Savan,

Yes i am scheduling the report through the management console. The start date is  5 pm 1/2/2008 and end date is 5 pm 1/2/2017.

 
Regards,
Priya
IP IP Logged
Savan
Senior Member
Senior Member
Avatar

Joined: 14 Dec 2007
Location: India
Online Status: Offline
Posts: 162
Quote Savan Replybullet Posted: 02 Jan 2008 at 3:40am
Priya,
 
While scheduling the report, u select the destination as the inbox instead of a specified directory. Also r u getting any specific error message when the report fails.  1 more question what are the days u r selecting when scheduling the report on weekly basis?
 
i m asking these details because i m not getting any error while scheduling the same report on daily or weekly basis.
 
Please do the changes accordingly and let me know if the problem still exists
Thanks
Savan
IP IP Logged
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum