Posted By: Doug64 — 18 Jul 2007 at 5:24am
One of the chart options for the gauge chart is to provide a beginning and ending value for a quality band in order to shade a portion of the gauge. I know how to do this using the report designer, but this requires me to set the values at design time. I want to be able to set the values at runtime in VB.Net based on data values that are coming from a database. Will your book show me how can I use the object model to set these quality band values at runtime?
Posted By: BrianBischof — 18 Jul 2007 at 9:09am
Unfortunately, I don't cover the gauge chart. I basically show a picture of it and give a few minor details. I never used it.

Maybe someone here can offer you some words of advice?