Greetings,
I am struggling with a Crystal reports design issue and I am hoping that all of you gurus out there might be able to help me.
I need to create a graph displaying usage of industrial-type equipment over a time range. The graph should be something like a stacked bar chart but each bar needs to display multiple segments of the same colour.
For example, each piece of equipment can have the following usage types: idle, full production, half production, out of use. Usage could be: 08:00-09:00 out of use 09:00-10:00 idle 10:00-11:00 half-production 11:00-11:15 idle 11:15-12:00 half production 12:00-13:00 full production 13:00-14:00 half production 14:00-14:15 idle etc.
All of this needs to be displayed in a single bar per peice of equipment. The date range may span multiple day.
I hope someone can help me out, zaroblan
|
Replies:
Posted By: LynnSchultz
Date Posted: 14 Dec 2009 at 9:24am
Did you figure out how to solve this? I have the same issue. Thanks.
Lynn
------------- Lynn Schultz
Denver, CO
|
|